Skip to content
Horizontal fire-tube boiler on a steel base with the front smokebox door, flanged branches and a burner mounting
Plant & Machinery

Plant & Machinery

Boilers

Fire-tube and water-tube boilers supplied and serviced, with re-tubing and tube-end work done in our own workshop or on your site.

Part of our Boiler Re-tubing service line — we supply, install and maintain it, not just sell it.

Overview

What it does.

Boilers fail slowly and then all at once. Tube wall thins, efficiency drifts down, fuel cost drifts up, and the first unambiguous sign is often a leak in a plant that cannot stop.

Re-tubing restores the unit rather than replacing it. Where the shell and tubesheets are sound, a full set of new tubes rolled and sealed brings the boiler back to its rated output at a fraction of a replacement, and without the shutdown a new installation would need.

We do the work in our workshop where the boiler can be moved and on site where it cannot, including tube removal, tube-end preparation, rolling, and the pressure test that follows.

Gallery

Representative units and components. Configuration, finish and connection sizes are built to the order — these show the range, not a fixed model.

Horizontal fire-tube boiler on a steel base with flanged branches on the crown and a front access door
Fire-tube shell on its base
Boiler with the front smokebox door hinged open, showing the tube ends and a brass gauge set alongside
Smokebox door open
Packaged boiler with a blue front plate, pressure gauge, isolating valves and flexible feed connection
Packaged unit with feed set
Compact boiler in a stainless carrying frame with a bolted front door and flanged pipework beneath
Skid-framed compact boiler
Boiler shell with the economiser tube bank alongside and the burner end plate in the foreground
Shell with economiser bank
Specification

The numbers.

Sizes, materials and duty are confirmed against your drawing and a site survey before quotation — nothing here is a fixed catalogue entry.

Technical

Boilers specification
TypesFire-tube and water-tube
ServiceSteam and hot water
Re-tubingFull or partial tube replacement
Tube endsRolled and expanded to specification
TestingHydrostatic test after rebuild

Indicative figures. Final specification is confirmed against your duty and site survey at quotation.

Materials of construction

Boilers materials
TubesCarbon steel to boiler specification
TubesheetRepaired or renewed as found
RefractoryRenewed where disturbed
GasketsDoor and manway seals renewed
Selection

Where it fits.

Applications

  • Process steam generation
  • Food and beverage processing
  • Hotel and hospital hot water
  • Power and utility auxiliary steam

Options & accessories

On-site re-tubing where the boiler cannot be movedBurner service and combustion tuningSafety valve overhaul and certificationEconomiser inspection and cleaningPlanned inspection on operating hours
Same category

More plant & machinery equipment.

Industrial compressor with a finned cylinder block, motor and pressure gauges on a machined base

Compressors

Reciprocating, screw and centrifugal compressors supplied, overhauled and recommissioned — including the bearings, seals and valve plates we hold as spares for the machines already under contract.

View product

Ready to start?

Breakdown response and planned maintenance, Kingdom-wide

Seven service lines. One engineering team. Tell us your load, site and timeline — we will come back with a costed proposal.