Skip to content

Service 04 · Design, Supply, Install & Commission

HVAC & MEP

Mechanical, electrical and plumbing engineering for commercial and industrial facilities — from load calculation and system design through installation, commissioning and handover.

Plant room mid-install with rectangular ductwork overhead and colour coded heating and chilled water risers
0KSA regions served
0+Years experience
0/7Emergency response
Overview

How we approach it.

Full-scope MEP means one team carries the job from load calculation to handover, so the ductwork suits the AHU, the electrical supply suits the plant, and nobody is negotiating an interface between three subcontractors halfway through the programme.

Design starts with a real load calculation — envelope, occupancy, process gains, fresh air requirement — because a system sized from a rule of thumb is either short of capacity on the peak day or oversized and cycling for the rest of the year.

We commission properly: airflows balanced and recorded, water side proportionally balanced, controls proven through their sequences, and an O&M package that someone can actually operate the building from.

Included in scope

  • Load calculation & design
  • Equipment procurement
  • Full installation
  • Commissioning & handover
On the job

Plant we have installed and equipment we have had apart — photographed on the shop floor and on site, not staged.

Air handling unit connected to supply ductwork, with its control panel and pipework alongside
Air handling unit and controls
Galvanised duct runs and an air handling unit set out in a concrete structural shell before finishes
Distribution set out before finishes
Pump set with motors on inertia bases, valved headers and an air handling unit behind
Pump set and valved headers
Plant room with spiral and rectangular ductwork above colour coded chilled water pipework and pumps
Ductwork over the pipe headers
Air handling unit marked AHU-2 with its coil connections, strainers and local control panel
Coil connections and local panel
Capability

What we can build to.

Ranges below cover the majority of what we make. Duties outside them are reviewed case by case rather than refused on principle.

HVAC & MEP capabilities
ScopeDesign, supply, install, commission, handover
Load calculationFull envelope, occupancy and process gain analysis
DuctworkGalvanised rectangular and round spiral, fabricated to drawing
Chilled waterPrimary/secondary, variable primary, DX split systems
ControlsStandalone and BMS-integrated
BalancingAir and water side, recorded and certified

Indicative figures. Final specification is confirmed against your duty and site survey at quotation.

Standards & testing

  • ASHRAE design methodology
  • SMACNA duct construction practice
  • Air and water balancing recorded and certified
Process

How the work runs.

The same sequence every time, so you know what happens next and what is expected of you at each stage.

  1. 01

    Load calculation & design

    Cooling and heating loads calculated from the building, not estimated from floor area. Equipment selected against the result.

  2. 02

    Drawings & approvals

    Layouts, schematics and equipment schedules issued for approval and coordinated against structure and other services.

  3. 03

    Procurement

    Plant and materials procured against the approved schedule, with delivery sequenced to the site programme.

  4. 04

    Installation

    Ductwork, pipework, plant and electrical installed by our own teams, with progressive inspection rather than one inspection at the end.

  5. 05

    Commissioning & handover

    Airflows and water flows balanced and recorded, control sequences proven, O&M documentation and operator training delivered.

Applications

Where it is used.

Commercial office fit-outHotels and hospitalityFood processing plantWarehousing and logisticsRetail and mixed useLight industrial facilities
Related equipment
Questions

Asked before you ask.

Will you take on design-and-build, or only install to someone else’s design?

Both. We are happy to install to a consultant’s design, and equally happy to take the design responsibility. If we are installing to a design we think is wrong, we will raise it in writing before starting rather than after.

Do you work on occupied buildings?

Yes. Phased work in live buildings is routine — it mainly changes the programme and the out-of-hours content, both of which we price openly rather than as variations later.

What does handover include?

Balancing records, commissioning sheets, as-built drawings, equipment documentation and operator training. If your facilities team cannot run the building from what we hand over, the handover is not finished.

Also from GBGCC

Other service lines.

Shell and tube heat exchanger with its channel head swung open, exposing the copper tube bundle and tubesheet

Shell & Tube Heat Exchanger

Custom-engineered shell and tube heat exchangers for process industries — from initial thermal design through precision fabrication, pressure testing, and field re-tubing of existing units.

Read more
Evaporative condenser on a plant deck with blue and red painted headers running to the coil connections

Evaporative Condensers

Evaporative condensers and closed-circuit cooling towers for refrigeration systems, process cooling, and industrial applications requiring efficient heat rejection with minimal water consumption.

Read more
Air cooled condenser bank seen from above, fan cowls across the deck and finned coil faces below

Air-Cooled Condensers

Air-cooled heat rejection equipment for applications where water availability is limited — from process radiators and dry coolers to refrigeration evaporators and industrial condensers.

Read more

Ready to start?

Breakdown response and planned maintenance, Kingdom-wide