
PVC Fills
Structured PVC fill media providing maximum water-to-air contact surface area for efficient heat rejection.
View product
Tower Internals & Spares
Three-pass PVC drift eliminators that keep water in the tower instead of on the roof, the car park, and your water bill.
Part of our Evaporative Condensers service line — we supply, install and maintain it, not just sell it.
Drift is water carried out of the tower as droplets in the discharge air. Unlike evaporation it does no cooling at all — it is pure loss, and it carries the tower’s dissolved solids and any treatment chemical with it.
A three-pass eliminator forces the air through successive direction changes so droplets impact and drain back. Worn or missing eliminators are one of the most common and most easily fixed causes of high make-up water consumption.
Representative units and components. Configuration, finish and connection sizes are built to the order — these show the range, not a fixed model.



Sizes, materials and duty are confirmed against your drawing and a site survey before quotation — nothing here is a fixed catalogue entry.
Technical
| Type | Three-pass blade |
|---|---|
| Material | PVC |
| Supply form | Packs cut to cell dimensions |
| Fitting | Drop-in, no adhesive required |
| Temperature limit | Up to 55 °C continuous |
Indicative figures. Final specification is confirmed against your duty and site survey at quotation.
Materials of construction
| Blade | Rigid PVC |
|---|---|
| Support frame | PVC or galvanised steel |
Applications
Options & accessories

Structured PVC fill media providing maximum water-to-air contact surface area for efficient heat rejection.
View product
PVC distribution nozzles engineered for uniform water coverage across the fill pack.
View product
PVC air inlet louvers controlling airflow, preventing splash-out, and protecting cooling tower internals.
View productReady to start?
Seven service lines. One engineering team. Tell us your load, site and timeline — we will come back with a costed proposal.